Planning Application WSCC/052/20

New Search — The consultation period for this application has now closed


  • Application Number
    WSCC/052/20
  • Status
    Application Approved
  • Location
    Land to the north of Eastergate and north-west of Barnham, PO22 0DF
  • Proposal
    Construction of a single carriageway with shared cycleway / footway, roundabouts, road markings, traffic signals, bus stops, provision of hard and soft landscaping, construction of a substation building, installation of a noise barrier, and other associated works
  • Date Valid
    28/10/2020
  • Deadline for Comments
    13/06/2021
  • Determination Date
    02/07/2021
  • Decision Date
    30/06/2021
  • Decision
    Granted with Conditions
  • Applicant's Name
    West Sussex County Council
  • Agent's Name
    WSP
  • Committee Date
    29/06/2021
  • District
    Arun
  • Parish
    Aldingbourne, Eastergate
  • County Councillor
    Trevor Bence, Fontwell
  • Case Officer
    James Neave

No map available for this application

Map Terms and Conditions

You are granted a non-exclusive, royalty free, revocable licence solely to view the Licensed Data for non-commercial purposes for the period during which West Sussex County Council makes it available;

You are not permitted to copy, sub-license, distribute, sell or otherwise make available the Licensed Data to third parties in any form; and

Third party rights to enforce the terms of this licence shall be reserved to Ordnance Survey

To view individual documents click on the file name for the required row and the document will open. To download a selection of individual documents, place a tick alongside each of the ones you wish to view and then click on the 'Download Selected' button. To open the sub-tables, click the sub-heading for the group.

Select All File Description Date Uploaded
Application Documents
Application Form.pdf (0 kb) Application Form 28/10/2020
Application Cover Letter.pdf (0 kb) Covering Letter 28/10/2020
Cover Letter_V04.pdf (0 kb) Covering Letter 06/05/2021
Reg 25 Response Table.pdf (0 kb) Supporting Document 06/05/2021
A29 Planning Statement Rev 3.pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix A - Planning Policy(1).pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix B - Minerals Safeguarding Statement (1).pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix C - Aerodrome Safeguarding Statement(1).pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix D - A29 Realignment Consultation Report(1).pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix E - Road Safety Audit and Designers Response(1).pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix F - Temporary & Permanent Land Take.pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Appendix G - Integration Statement.pdf (0 kb) Revised Planning Statement & Apendicies 06/05/2021
Fontwell Farm Access Vehicle Tracking.pdf (0 kb) Application Plans 06/05/2021
Wider Context Plan.pdf (0 kb) Application Plans 06/05/2021
Landscaping Illustrative- Section A-A.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section B-B.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section C-C.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section D-D.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section E-E.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section F-F.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Landscaping Illustrative- Section G-G.pdf (0 kb) Illustrative Landscaping Section 21/05/2021
Chapter 1 - Introduction.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 2 - The Existing Site.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 3 - Description of the Scheme.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 4 - Consideration of Alternatives.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 5 - Approach to EIA.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 6 - Air Quality.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 7 - Noise and Vibration (with figure list).pdf (0 kb) Revised Environmental Statement 20/05/2021
Chapter 8 - Transport and Access.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 9 - Ecology.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 10 - LVIA (updated figure list).pdf (0 kb) Revised Environmental Statement 21/05/2021
Chapter 11 - Water Resources.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 12 - Geology and Soils.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 13 - Archaeology and Heritage.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 14 - Cumulative Effects.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 15 - Summary and Conclusion.pdf (0 kb) Revised Environmental Statement 06/05/2021
Volume 3 - Non Tech Summary.pdf (0 kb) Revised Environmental Statement 06/05/2021
Figure 1.1 - Site Location Plan.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 1.2 - Aerial View.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 1-3 - Planning application boundary.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 2.1 - Environmental Constraints.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 3.1 - Phase 1 and Phase 2.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 6-1 - AQ Affected Road Network.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 6-2 - Monitoring SitesV02.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 6-3 - Construction Dust Receptors.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 6-4 - Operational Phase.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 7.1 to 7.5 Noise.pdf (0 kb) Revised Environmental Statement Figures 20/05/2021
Figure 7-6 - Long-term mod and maj receptors above LOAEL.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 10.1 - Zone of Theoretical Visibility.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 10.2 - Site Context Plan.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 10.3 - Landscape Character Areas.pdf (0 kb) Revised Environmental Statement Figures 06/05/2021
Figure 10.4 - Landscape Viewpoints.pdf (0 kb) Revised Environmental Statement Figures 21/05/2021
Appendix 1.1 - A29 Phase 1_Reg 25 Response Table.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1 - Design Drawings Part 1.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1 - Design Drawings Part 2.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1 - Design Drawings Part 3.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1 - Design Drawings Part 4.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1 - Design Drawings Part 5.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1a - Site Clearance Plans.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1b - New Section Drawings_Optimized.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.1c Swepth Path Drawings.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.2 - GI Strategy Part 2.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.2 -GI Strategy_Part 1.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.3 - Landscape Strategy.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.4 - Arboricultural Report and Tree Protection Plan.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 1.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 2.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 3.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 4.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 5.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 6.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.5 - OCEMP - Part 7.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.6 - Wider Landscape Plan.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.7 - Design Standards and Departures.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 3.8 - Compound Sites.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.1 - Scoping Report Part 1(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.1 - Scoping Report Part 2(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.1 - Scoping Report Part 3(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.1 - Scoping Report Part 4(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.2 - Scoping Opinion(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 5.2b - Scoping email from WSCC(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 6.1 - 6.6 - AQ Appendices(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 7.1 - Noise Monitoring Forms - A29 P1(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 7.2 - Construction Plant and Machinery(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 7.3 - Operational Noise(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.1 - Transport Assessment - Appendices Part 1.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.1 - Transport Assessment - Appendices Part 2.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.1 - Transport Assessment.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.2 - A29 WCHAR Part 1(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.2 - A29 WCHAR Part 2(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 8.2 - A29 WCHAR Part 3(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.1 - Prelim Ecol App(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.2 - Bats(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.4 - Dormouse(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.5 - Breeding Bird(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.6 - Wintering Bird(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.7 - Reptiles(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.8 - GCN Survey Report(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.9 HRSA - edit_Optimized(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 9.10 - BNG Final Assessment(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 10.1 - LVA Methodology(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 10.2 - Lighting Assessment(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 10.3 - Planting Schedule(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 10.4 - Landscape Management and Maintenance Plan.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 2.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 3.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 4.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 5.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 6.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 7.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 8.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 9.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA - Part 10.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.1 - FRA_Part 1.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.2 - HEWRAT(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 11.3 - Watercourse Location Map(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA - Part 1(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA -Part 2(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA -Part 3(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA -Part 4(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA -Part 5(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 12.1 - PRA -Part 6(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.1 - ADBA(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.2 - Geophysical survey(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.3 - Arch Mitigation Stategy Part 2(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.3 - Arch Mitigation Stategy Part 3(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.3 - Arch Mitigation Stategy Part 4(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.3 - Arch Mitigation Stategy Part 5(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.3 - Arch Mitigation Strategy Part 1(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 13.4 - Arch WSI(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 14.1 - Long-list of committed developments(1).pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
Appendix 14.2 - Integration Statement.pdf (0 kb) Revised Environmental Statement Apendicies 06/05/2021
ES Addendum 2021.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 1.1 and 1.2.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 2.1.b.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 2.1.c.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 2.1a.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 2.2.pdf (0 kb) Environmental Statement Addendum 06/05/2021
ES Addendum 2021 - Appendix 2.3.pdf (0 kb) Environmental Statement Addendum 06/05/2021
Drainage clarifications 04 06 21.pdf (0 kb) Additional Information 04/06/2021
Noise and Vibration - Non Technical note.pdf (0 kb) Additional Information 17/06/2021
Map - Short Term Noise Impacts at Receptors_DAY.pdf (0 kb) Additional Information 17/06/2021
Map - Short Term Noise Impacts at Receptors_NIGHT.pdf (0 kb) Additional Information 17/06/2021
Approved Documents
3 Rail Fence Details.pdf (0 kb) Application Plans 06/05/2021
4 and 5 Rail Fence Details.pdf (0 kb) Application Plans 06/05/2021
Application Site Boundary.pdf (0 kb) Application Plans 06/05/2021
Attenuation Pond 3 Sections Sheet 2 of 3.pdf (0 kb) Application Plans 06/05/2021
Attenuation Pond 4 Sections Sheet 3 of 3.pdf (0 kb) Application Plans 06/05/2021
Badger Mesh Fencing.pdf (0 kb) Application Plans 06/05/2021
Cross Sections Sheet 1 of 3 (update).pdf (0 kb) Application Plans 21/05/2021
Cross Sections Sheet 2 of 3 (update).pdf (0 kb) Application Plans 21/05/2021
Cross Sections Sheet 3 of 3 (update).pdf (0 kb) Application Plans 21/05/2021
Drainage Strategy Layout(1).pdf (0 kb) Application Plans 06/05/2021
Fencing Layout Sheet 1 of 5.pdf (0 kb) Application Plans 06/05/2021
Fencing Layout Sheet 2 of 5.pdf (0 kb) Application Plans 06/05/2021
Fencing Layout Sheet 3 of 5.pdf (0 kb) Application Plans 06/05/2021
Fencing Layout Sheet 4 of 5.pdf (0 kb) Application Plans 06/05/2021
Fencing Layout Sheet 5 of 5.pdf (0 kb) Application Plans 06/05/2021
Fontwell Avenue Roundabout Section (update).pdf (0 kb) Application Plans 21/05/2021
Barnham Road Roundabout Section (update).pdf (0 kb) Application Plans 21/05/2021
Infiltration Pond 2 Sections Sheet 1 of 3.pdf (0 kb) Application Plans 06/05/2021
Landscape Planting Schedule.pdf (0 kb) Application Plans 06/05/2021
Outline Construction Compound Plan.pdf (0 kb) Application Plans 06/05/2021
Plan & Profile Sheet 1 of 4.pdf (0 kb) Application Plans 06/05/2021
Plan & Profile Sheet 2 of 4.pdf (0 kb) Application Plans 06/05/2021
Plan & Profile Sheet 3 of 4.pdf (0 kb) Application Plans 06/05/2021
Plan & Profile Sheet 4 of 4.pdf (0 kb) Application Plans 06/05/2021
Pond 4 Access Track Plan and Profile.pdf (0 kb) Application Plans 06/05/2021
Proposed Bus Stop Locations.pdf (0 kb) Application Plans 06/05/2021
Proposed Elevations Noise Barrier Sheet 1 of 2.pdf (0 kb) Application Plans 06/05/2021
Proposed Elevations Noise Barrier Sheet 2 of 2.pdf (0 kb) Application Plans 06/05/2021
Proposed Landscape Plan.pdf (0 kb) Application Plans 06/05/2021
Proposed Site Plan Sheet 1 of 5.pdf (0 kb) Application Plans 06/05/2021
Proposed Site Plan Sheet 2 of 5.pdf (0 kb) Application Plans 06/05/2021
Proposed Site Plan Sheet 3 of 5.pdf (0 kb) Application Plans 06/05/2021
Proposed Site Plan Sheet 4 of 5.pdf (0 kb) Application Plans 06/05/2021
Proposed Site Plan Sheet 5 of 5.pdf (0 kb) Application Plans 06/05/2021
Proposed SSE Substation Layout & Cross Sections.pdf (0 kb) Application Plans 06/05/2021
Site Clearance Layout Sheet 1 of 5.pdf (0 kb) Application Plans 06/05/2021
Site Clearance Layout Sheet 2 of 5.pdf (0 kb) Application Plans 06/05/2021
Site Clearance Layout Sheet 3 of 5.pdf (0 kb) Application Plans 06/05/2021
Site Clearance Layout Sheet 4 of 5.pdf (0 kb) Application Plans 06/05/2021
Site Clearance Layout Sheet 5 of 5.pdf (0 kb) Application Plans 06/05/2021
Steel Single Field Gate.pdf (0 kb) Application Plans 06/05/2021
Drainage Strategy.pdf (0 kb) Environmental Statement 15/07/2021
SuDS Managemet Train.pdf (0 kb) Environmental Statement 15/07/2021
Consultation Response
WSCC Public Rights of Way.pdf (0 kb) Consultation Response 12/11/2020
Natural England.pdf (0 kb) Consultation Response 18/11/2020
Environment Agency.pdf (0 kb) Consultation Response 20/11/2020
WSCC Archaeology.pdf (0 kb) Consultation Response 02/12/2020
Barnham and Eastergate Parish Council.pdf (0 kb) Consultation Response 08/12/2020
Barnham and Eastergate Parish Council - 2.pdf (0 kb) Consultation Response 08/12/2020
Aldingbourne Parish Council.pdf (0 kb) Consultation Response 09/12/2020
WSCC Ecology.pdf (0 kb) Consultation Response 10/12/2020
Walberton Parish Council.pdf (0 kb) Consultation Response 11/12/2020
Arun District Council.pdf (0 kb) Consultation Response 18/12/2020
South Downs National Park.pdf (0 kb) Consultation Response 21/12/2020
WSCC Highways.pdf (0 kb) Consultation Response 08/01/2021
WSCC Tree Officer.pdf (0 kb) Consultation Response 11/01/2021
Arun District Council EHO.pdf (0 kb) Consultation Response 14/01/2021
WSCC Drainage and Flooding.pdf (0 kb) Consultation Response 19/01/2021
Highways England.pdf (0 kb) Consultation Response 01/02/2021
WSCC Landscape Architect.pdf (0 kb) Consultation Response 02/02/2021
WSCC Public Rights of Way 2.pdf (0 kb) Consultation Response 18/05/2021
WSCC Archaeology 2.pdf (0 kb) Consultation Response 26/05/2021
Natural England 2.pdf (0 kb) Consultation Response 26/05/2021
WSCC Drainage and Flooding 2.pdf (0 kb) Consultation Response 26/05/2021
BEPC Response to Planning Applicatin WSCC-052-20 - June 2021.pdf (0 kb) Consultation Response 03/06/2021
APPENDIX TO BEPC RESPONSE TO PLANNING APPLICATION WSCC-052-20.pdf (0 kb) Consultation Response 03/06/2021
Environment Agency 2.pdf (0 kb) Consultation Response 04/06/2021
WSCC Tree Officer 2.pdf (0 kb) Consultation Response 04/06/2021
WSCC Landscape Architect 2.pdf (0 kb) Consultation Response 09/06/2021
Highways England 2.pdf (0 kb) Consultation Response 09/06/2021
WSCC Drainage and Flooding 3.pdf (0 kb) Consultation Response 09/06/2021
WSCC Ecology 2.pdf (0 kb) Consultation Response 09/06/2021
WSCC Highways 2.pdf (0 kb) Consultation Response 09/06/2021
Arun District Council 2.pdf (0 kb) Consultation Response 15/06/2021
Arun District Council EHO - 2.pdf (0 kb) Consultation Response 15/06/2021
South Downs National Park 2.pdf (0 kb) Consultation Response 29/06/2021
WSCC Highways.pdf (0 kb) Consultation Response 07/08/2023
Decisions and Reports
WSCC 052 20 Committee Report.pdf (0 kb) Committee Report 23/06/2021
DECISION NOTICE_WSCC-052-20.pdf (0 kb) Decision Notice 30/06/2021
Other Correspondence
Regulation 25 Further Info Request - 03 02 21doc.pdf (0 kb) Other Correspondence 03/02/2021
Extension of Statutory Time Limit.pdf (0 kb) Extension Of Statutory Time Limit 23/02/2021
Post Decision
ApplicationForm.pdf (0 kb) Conditional Scheme - Pending 21/12/2021
Cover Letter - conditions 16 12 21.pdf (0 kb) Conditional Scheme - Pending 21/12/2021
Condition 7 - Discharged.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
WSP Letter 8 March 22.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Technical Note 22 10 22.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Drainage Layout Plan (Sheets 1-5).pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Drainage Details (Sheets 1-2).pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Infiltration Pond 2.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Attenuation Pond 3.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Attenuation Pond 4.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Typical details for SDS infiltration Tanks.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Drainage-Manhole-Pipe Schedule .xlsx (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Highway Specification Drainage and Service Ducts Appendix 5.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
SUDs Management Train.pdf (0 kb) Condition 7 (Drainage) - Approved 09/03/2022
Condition 15 Discharged.pdf (0 kb) Condition 15 (Infiltration) - Approved 09/03/2022
Hydrogeological DQRA.pdf (0 kb) Condition 15 (Infiltration) - Approved 09/03/2022
EA Letter 12 Apr 21.pdf (0 kb) Condition 15 (Infiltration) - Approved 09/03/2022
SUDs Management Train.pdf (0 kb) Condition 15 (Infiltration) - Approved 09/03/2022
Conditions 11 & 12 Discharged.pdf (0 kb) Conditions 11 & 12 - Acoustic Barrier & Noise Verification - Approved 04/07/2022
WSP Memo.pdf (0 kb) Condition 11 (Acoustic Barrier) - Approved 10/03/2022
A29-CAP-HPN-00-DR-C-0183 S0-P06.pdf (0 kb) Condition 11 (Acoustic Barrier) - Approved 10/03/2022
A29-CAP-HPN-00-DR-C-0184 S0-P06.pdf (0 kb) Condition 11 (Acoustic Barrier) - Approved 10/03/2022
METASoundBlok-CORTEN datasheet.pdf (0 kb) Condition 11 (Acoustic Barrier) - Approved 10/03/2022
Noise Barrier Design Clarifications.pdf (0 kb) Condition 11 (Acoustic Barrier) - Approved 07/04/2022
WSP Memo.pdf (0 kb) Condition 12 (Noise Verification) - Approved 10/03/2022
Figure 7-6.pdf (0 kb) Condition 12 (Noise Verification) - Approved 10/03/2022
Conditions 5 & 17 Discharged.pdf (0 kb) Conditions 5 & 17 (Ecological Enhancement & LEMP) - Approved 04/07/2022
WSP Memo.pdf (0 kb) Condition 5 (Ecological Enhancement) - Approved 10/03/2022
Ecological Mitigation Plan June 22.pdf (0 kb) Condition 5 (Ecological Enhancement) - Approved 27/06/2022
A29-CAP-HGN-00-DR-C-0187 S4-P05.pdf (0 kb) Condition 5 (Ecological Enhancement) - Approved 10/03/2022
70079718-WSP-3000-RP-LA-0001 - LEMP_v3_signed.pdf (0 kb) Condition 17 (LEMP) - Approved 30/06/2022
Condition 19 - Discharged.pdf (0 kb) Condition 19 (Bus Shelters) - Approved 07/06/2022
WSP Memo V2.pdf (0 kb) Condition 19 (Bus Shelters) - Approved 14/04/2022
A29-CAP-HGN-00-DR-C-0276 S3-P03.pdf (0 kb) Condition 19 (Bus Shelters) - Approved 10/03/2022
ARUN Pitched Roof.pdf (0 kb) Condition 19 (Bus Shelters) - Approved 10/03/2022
Condition 14 Discharged.pdf (0 kb) Condition 14 (Fencing) - Approved 04/07/2022
WSP Memo.pdf (0 kb) Condition 14 (Fencing) - Approved 24/03/2022
Fencing Sheet 1.pdf (0 kb) Condition 14 (Fencing) - Approved 27/06/2022
Fencing Sheet 2.pdf (0 kb) Condition 14 (Fencing) - Approved 27/06/2022
Fencing Sheet 3.pdf (0 kb) Condition 14 (Fencing) - Approved 27/06/2022
Fencing Sheet 4.pdf (0 kb) Condition 14 (Fencing) - Approved 27/06/2022
Fencing Sheet 5.pdf (0 kb) Condition 14 (Fencing) - Approved 27/06/2022
HCD H3 - Fence Post Foundation Details.pdf (0 kb) Condition 14 (Fencing) - Approved 24/03/2022
MCHW H15 - Post & 3 Rail Fence Details.pdf (0 kb) Condition 14 (Fencing) - Approved 24/03/2022
MCHW H17 - Steel Single Field Gate.pdf (0 kb) Condition 14 (Fencing) - Approved 24/03/2022
MCHW H46 - Badger Mesh Fencing.pdf (0 kb) Condition 14 (Fencing) - Approved 24/03/2022
Condition 6 - Discharged.pdf (0 kb) Condition 6 (Landscaping) - Approved 04/07/2022
WSP Memo.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
Landscaping Sheet 1 -A29-CAP-HPN-00-DR-C-0132 S0-P13.pdf (0 kb) Condition 6 (Landscaping) - Approved 27/06/2022
Landscaping Sheet 2 -A29-CAP-HPN-00-DR-C-0133 S0-P17.pdf (0 kb) Condition 6 (Landscaping) - Approved 27/06/2022
Landscaping Sheet 3 -A29-CAP-HPN-00-DR-C-0134 S0-P13.pdf (0 kb) Condition 6 (Landscaping) - Approved 27/06/2022
Landscaping Sheet 4 -A29-CAP-HPN-00-DR-C-0135 S0-P15.pdf (0 kb) Condition 6 (Landscaping) - Approved 27/06/2022
Landscaping Sheet 5 - A29-CAP-HPN-00-DR-C-0136 S0-P12.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
Planting and Seeding Schedule June 22 .pdf (0 kb) Condition 6 (Landscaping) - Approved 27/06/2022
A29-WSP-LA-CS-001 - SectionA-A.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
A29-WSP-LA-CS-002 - SectionB-B.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
A29-WSP-LA-CS-003 - SectionC-C.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
A29-WSP-LA-CS-004 - SectionD-D.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
A29-WSP-LA-CS-005 - SectionE-E.pdf (0 kb) Condition 6 (Landscaping) - Approved 24/03/2022
Conditions 3 & 4 Discharged.pdf (0 kb) Conditions 3 & 4 (CEMP & CTMP) - Approved 04/07/2022
WSP Memo.pdf (0 kb) Condition 4 (CTMP) - Approved 29/03/2022
A29-JCE-GEN-00-PW-Z-021_S4_P04 - CTMP - updated tracking.pdf (0 kb) Condition 4 (CTMP) - Approved 05/05/2022
WSP Memo.pdf (0 kb) Condition 3 (CEMP) - Approved 29/03/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP-text.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP- APPX A.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP-APPX B.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP-APPX C.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP-APPX D.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP- APPX E to J.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP-APPX K.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
A29-JCE-GEN-00-PW-Z-009_S4_P11 - CEMP- APPX L and M.pdf (0 kb) Condition 3 (CEMP) - Approved 04/07/2022
Condition 13 - Discharged.pdf (0 kb) Condition 13 (Lighting) - Approved 07/06/2022
WSP memo.pdf (0 kb) Condition 13 (Lighting) - Approved 31/03/2022
70079718-WSP-A29-XX-RP-LI-0001-P03_Lighting Scheme (11 05 22).pdf (0 kb) Condition 13 (Lighting) - Approved 19/05/2022
NMA decision -WSCC 052 20 NMA1.pdf (0 kb) Non-Material Amendment Decision - WSCC 052 20 NMA1 07/06/2022
Application Form and Notices.pdf (0 kb) Non-Material Amendment 25/04/2022
Environmental Statement.pdf (0 kb) Non-Material Amendment 25/04/2022
NMA Cover Letter.pdf (0 kb) Non-Material Amendment 25/04/2022
SITE PLAN - A29-CAP-HPN-00-DR-C-0133-P14.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Infiltration Pond 2 - A29-CAP-HPN-00-DR-D-0240-P04.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Plan and Profile 2 of 4 - A29-CAP-HPN-00-DR-C-0176-P05.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Proposed Landscape w Redline Boundary - A29-CAP-HPN-00-DR-C-0239 S0-P04.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Site Clearance Layout Sheet 2 of 5 - A29-CAP-HPN-00-DR-C-0247-P02.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Bus Stop Locations - A29-CAP-HGN-00-DR-C-0252-P02.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Cross Sections Sheet 1 of 3 - A29-CAP-HPN-00-DR-C-0180-P09.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Cross Sections Sheet 2 of 3 - A29-CAP-HPN-00-DR-C-0181-P09.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Cross Sections Sheet 3 of 3 - A29-CAP-HPN-00-DR-C-0182-P10.pdf (0 kb) Non-Material Amendment - Approved Plan/Doc 25/04/2022
Public Comments
Jim Butler Objection 12-11-2020.pdf (0 kb) Objection Jim Butler 12/11/2020 12/11/2020
JENNIFER PRICE Objection 12-11-2020.pdf (0 kb) Objection JENNIFER PRICE 12/11/2020 12/11/2020
Richard Blott Objection 13-11-2020.pdf (0 kb) Richard Blott Objection 13 11 2020 13/11/2020
Linda Wale. Objection 16-11-2020.pdf (0 kb) Objection Linda Wale. 16/11/2020 16/11/2020
Sarah Stone Objection 15-11-2020.pdf (0 kb) Sarah Stone Objection 15 11 2020 17/11/2020
Martin Sutton Objection 17-11-2020.pdf (0 kb) Objection Martin Sutton 17/11/2020 17/11/2020
Harris Objection 18-11-2020.pdf (0 kb) Objection Harris 18/11/2020 18/11/2020
D.A.Bourner Objection 19-11-2020.pdf (0 kb) Objection D.A.Bourner 19/11/2020 19/11/2020
John Searancke Objection 23-11-2020.pdf (0 kb) Objection John Searancke 23/11/2020 23/11/2020
Mr Kim Miller Comment 25-11-2020.pdf (0 kb) Mr Kim Miller Comment 25-11-2020 25/11/2020
Jessica Stone Objection 29-11-2020.pdf (0 kb) Jessica Stone Objection 29-11-2020 01/12/2020
Helen Wale Objection 02-12-2020.pdf (0 kb) Objection Helen Wale 02/12/2020 02/12/2020
Malcolm Fraser Objection 02-12-2020.pdf (0 kb) Objection Malcolm Fraser 02/12/2020 02/12/2020
John M Upton Objection 03-12-2020.pdf (0 kb) Objection John M Upton 03/12/2020 03/12/2020
IMG_0381.pdf (0 kb) Example of the deer living in the area where you intend to build. 04/12/2020
IMG_0374.pdf (0 kb) Example of the deer living in the area where you intend to build. 04/12/2020
IMG_0370.pdf (0 kb) Example of the deer living in the area where you intend to build. 04/12/2020
Peter Hake Objection 04-12-2020.pdf (0 kb) Objection Peter Hake 04/12/2020 04/12/2020
Katie de la Fuente Objection 04-12-2020.pdf (0 kb) Objection Katie de la Fuente 04/12/2020 04/12/2020
Clare Wood Objection 04-12-2020.pdf (0 kb) Objection Clare Wood 04/12/2020 04/12/2020
Mrs Lynne Sharrock Objection 07-12-2020.pdf (0 kb) Objection Mrs Lynne Sharrock 07/12/2020 07/12/2020
Peter Harvey Objection 08-12-2020.pdf (0 kb) Objection Peter Harvey 08/12/2020 08/12/2020
A29 realignment Barnham Road roundabout.pdf (0 kb) Proximity of new Barnham Road roundabout to Green Oaks driveway. 08/12/2020
Rick Priest Objection 08-12-2020.pdf (0 kb) Objection Rick Priest 08/12/2020 08/12/2020
Linda Hargreaves Comment 08-12-2020.pdf (0 kb) Comment Linda Hargreaves 08/12/2020 08/12/2020
Mr Price Objection 09-12-2020.pdf (0 kb) Mr Price Objection 09 12 2020 09/12/2020
Jonathan Hicks Comment 09-12-2020.pdf (0 kb) Comment Jonathan Hicks 09/12/2020 09/12/2020
Genna Freeborn Objection 11-12-2020.pdf (0 kb) Objection Genna Freeborn 11/12/2020 11/12/2020
Deborah Owen-Ellis Clark Objection 11-12-2020.pdf (0 kb) Objection Deborah Owen-Ellis Clark 11/12/2020 11/12/2020
Mike Soper Objection 11-12-2020.pdf (0 kb) Objection Mike Soper 11/12/2020 11/12/2020
Vanessa Barker Objection 12-12-2020.pdf (0 kb) Objection Vanessa Barker 12/12/2020 12/12/2020
M Hersey Objection 12-12-2020.pdf (0 kb) Objection M Hersey 12/12/2020 12/12/2020
Richard Blott Objection 12-12-2020.pdf (0 kb) Objection Richard Blott 12/12/2020 12/12/2020
Paul Burchell Objection 13-12-2020.pdf (0 kb) Objection Paul Burchell 13/12/2020 13/12/2020
Andrew Shepherd Objection 13-12-2020.pdf (0 kb) Objection Andrew Shepherd 13/12/2020 13/12/2020
Linda Wale Objection 13-12-2020.pdf (0 kb) Objection Linda Wale 13/12/2020 13/12/2020
Mark Phillips Objection 13-12-2020.pdf (0 kb) Objection Mark Phillips 13/12/2020 13/12/2020
Lynsey Macdonald Objection 13-12-2020.pdf (0 kb) Objection Lynsey Macdonald 13/12/2020 13/12/2020
Simon McOwan Objection 13-12-2020.pdf (0 kb) Objection Simon McOwan 13/12/2020 13/12/2020
Jim Willis Objection 13-12-2020.pdf (0 kb) Objection Jim Willis 13/12/2020 13/12/2020
James Thomas Comment 13-12-2020.pdf (0 kb) Comment James Thomas 13/12/2020 13/12/2020
Laura Webb Objection 13-12-2020.pdf (0 kb) Objection Laura Webb 13/12/2020 13/12/2020
Davina Rowe Objection 13-12-2020.pdf (0 kb) Objection Davina Rowe 13/12/2020 13/12/2020
Andrew and Carolyn Law Objection 14-12-2020.pdf (0 kb) Objection Andrew and Carolyn Law 14/12/2020 14/12/2020
Sandra Hulley Objection 14-12-2020.pdf (0 kb) Objection Sandra Hulley 14/12/2020 14/12/2020
Denyse Burtenshaw Objection 14-12-2020.pdf (0 kb) Objection Denyse Burtenshaw 14/12/2020 14/12/2020
ALAN ALLISON Objection 14-12-2020.pdf (0 kb) Objection ALAN ALLISON 14/12/2020 14/12/2020
Adam Bell Objection 14-12-2020.pdf (0 kb) Objection Adam Bell 14/12/2020 14/12/2020
Carl & Catherine Monk Objection 14-12-2020.pdf (0 kb) Carl & Catherine Monk Objection 14 12 2020 14/12/2020
Ian & Janet McKay Objection 14-12-2020.pdf (0 kb) Ian & Janet Mckay Objection 14 12 2020 14/12/2020
Mrs Susie & Dr David Peters Objection 14-12-2020.pdf (0 kb) Mrs Susie & Dr David Peters Objection 14 12 2020 14/12/2020
Mr Bernard & Mrs Jean Lane Objection 14-12-2020.pdf (0 kb) Mr Bernard & Mrs Jean Lane Objection 14 12 2020 14/12/2020
Gordon Bell Objection 14-12-2020.pdf (0 kb) Objection Gordon Bell 14/12/2020 14/12/2020
Richard Smith Objection 14-12-2020.pdf (0 kb) Objection Richard Smith 14/12/2020 14/12/2020
Heather Godsmark Objection 15-12-2020.pdf (0 kb) Heather Godsmark Objection 15 12 2020 16/12/2020
Julie Giddings Objection 15-12-2020.pdf (0 kb) Julie Giddings Objection 15 12 2020 15/12/2020
Mr & Mrs Neville Smith Objection 15-12-2020.pdf (0 kb) Objection Mr & Mrs Neville Smith 15/12/2020 15/12/2020
Jane Chew Objection 15-12-2020.pdf (0 kb) Objection Jane Chew 15/12/2020 15/12/2020
The Southern Consortium Comment 15-12-2020.pdf (0 kb) The Southern Consortium Comment 15-12-2020 16/12/2020
Linda Wale Objection 22-12-2020.pdf (0 kb) Linda Wale Objection 22 12 2020 22/12/2020
J & S Searancke Objection 22-12-2020.pdf (0 kb) J & S Searancke Objection 22-12-2020 23/12/2020
Mike Davis Objection 26-01-2021.pdf (0 kb) Objection Mike Davis 26/01/2021 26/01/2021
Linda Wale Objection 13-02-2021.pdf (0 kb) Linda Wale Objection 13-02-2021 18/02/2021
J & S Searancke Objection 12-2-2021.pdf (0 kb) J & S Searancke Objection 12-2-2021 09/03/2021
Chantry Mead Management Company Ltd Objection 22-04-2021.pdf (0 kb) Chantry Mead Management Company Ltd Objection 22-04-2021 29/04/2021
Genna Freeborn Objection 12-5-2021.pdf (0 kb) Genna Freeborn Objection 12-5-2021 12/05/2021
Dean Thompson Objection 16-05-2021.pdf (0 kb) Objection Dean Thompson 16/05/2021 16/05/2021
Alex Moss Objection 16-05-2021.pdf (0 kb) Objection Alex Moss 16/05/2021 16/05/2021
linda Wale Objection 18-05-2021.pdf (0 kb) Objection linda Wale 18/05/2021 18/05/2021
John & Sally Searancke Objection 24-05-2021.pdf (0 kb) Objection John & Sally Searancke 24/05/2021 24/05/2021
Linda Whale Further Objection 20-05-2021.pdf (0 kb) Linda Whale Further Objection 20-05-2021 25/05/2021
Mr Miller Objection 20-05-2021.pdf (0 kb) Mr Miller Objection 20-05-2021 25/05/2021
Mr Miller Objection 2 20-05-2021.pdf (0 kb) Mr Miller Objection 2 20-05-2021 25/05/2021
AG Comments A29.pdf (0 kb) Written scanned submission of comments relating to WSCC/052/20. 01/06/2021
Andrew Griffith MP Comment 01-06-2021.pdf (0 kb) Comment Andrew Griffith MP 01/06/2021 01/06/2021
garden view 1.pdf (0 kb) View from back garden June 21 04/06/2021
garden view 2.pdf (0 kb) Back garden without 3m wall 04/06/2021
meadow land for progress.pdf (0 kb) Back garden view showing route of proposed A29 04/06/2021
Deer.pdf (0 kb) Deer grazing in meadow at back garden. 04/06/2021
sarah stone Objection 04-06-2021.pdf (0 kb) Objection sarah stone 04/06/2021 04/06/2021
Martin Sutton Objection 07-06-2021.pdf (0 kb) Objection Martin Sutton 07/06/2021 07/06/2021
Julie Giddings Objection 10-06-2021.pdf (0 kb) Objection Julie Giddings 10/06/2021 10/06/2021
Richard Blott Objection 11-06-2021.pdf (0 kb) Objection Richard Blott 11/06/2021 11/06/2021
Mrs JA Smith Objection 13-06-2021.pdf (0 kb) Objection Mrs JA Smith 13/06/2021 13/06/2021
Jim Robinson Objection 13-06-2021.pdf (0 kb) Objection Jim Robinson 13/06/2021 13/06/2021
Richard Smith Objection 13-06-2021.pdf (0 kb) Objection Richard Smith 13/06/2021 13/06/2021
Carol and Lawrebce Owers Objection 13-06-2021.pdf (0 kb) Objection Carol and Lawrebce Owers 13/06/2021 13/06/2021
Lynsey Macdonald Objection 14-06-2021.pdf (0 kb) Lynsey Macdonald Objection 14/06/2021 15/06/2021
Heather Godsmark Objection 13-06-2021.pdf (0 kb) Heather Godsmark Objection 13/06/2021 15/06/2021
Carl and Catherine Monk Objection 16-06-2021.pdf (0 kb) Carl and Catherine Monk Objection 16/06/2021 15/06/2021
Rick Priest Objection 14-06-2021.pdf (0 kb) Rick Priest Objection 14/06/2021 15/06/2021
Heather Godsmark Comment 21-06-2021.pdf (0 kb) Heather Godsmark Comment 21-06-2021 22/06/2021
Mike Croker Comment 27-06-2021.pdf (0 kb) Mike Croker Comment 27-06-2021 29/06/2021
Carolyn Beckingham Objection 27-06-2021.pdf (0 kb) Carolyn Beckingham Objection 27-06-2021 29/06/2021
Lisa Objection 27-06-2021.pdf (0 kb) Lisa Objection 27-06-2021 29/06/2021
Mark Record Comment 28-06-2021.pdf (0 kb) Mark Record Comment 28-06-2021 29/06/2021
Victor Lent Comment 27-06-2021.pdf (0 kb) Victor Lent Comment 27-06-2021 29/06/2021
Lisa Objection 29-06-2021.pdf (0 kb) Lisa Objection 29-06-2021 29/06/2021
Dean Thompson Comments 03-07-2021.pdf (0 kb) Dean Thompson Comments 03 07 2021 08/07/2021
Superseded
A29 Realignment (Phase 1) Non Technical Summary.pdf (0 kb) Environmental Statement 28/10/2020
A29 Realignment Environmental Statement - Part 1 - Signed.pdf (0 kb) Environmental Statement 28/10/2020
A29 Realignment Environmental Statement - Part 2.pdf (0 kb) Environmental Statement 28/10/2020
A29 Realignment Environmental Statement - Part 3.pdf (0 kb) Environmental Statement 28/10/2020
A29 Realignment Environmental Statement - Part 4.pdf (0 kb) Environmental Statement 28/10/2020
A29 Realignment Environmental Statement - Part 5.pdf (0 kb) Environmental Statement 28/10/2020
Appendix 3.1 - Design Drawings.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.1a - Site Clearance Plan.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.2 - A29 Green Infrastructure Strategy_Optimized.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.3 - Landscape strategy PUBLIC.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.4 - Arb Report and Tree Protection Plan.pdf (0 kb) Supporting Document 12/11/2020
Appendix 3.5 - Outline CEMP Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.5 - Outline CEMP Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 3.5 - Outline CEMP Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.1 - Scoping Report Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.1 - Scoping Report Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.1 - Scoping Report Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.1 - Scoping Report Part 4.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.2 - Scoping Opinion.pdf (0 kb) Supporting Document 28/10/2020
Appendix 5.2b - Scoping email from WSCC.pdf (0 kb) Supporting Document 28/10/2020
Appendix 6.1 - 6.6 - AQ Appendices.pdf (0 kb) Supporting Document 28/10/2020
Appendix 7.1 - Noise Monitoring Forms - A29 P1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 7.2 - Construction Plant and Machinery.pdf (0 kb) Supporting Document 28/10/2020
Appendix 7.3 - Operational Noise.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.1 - TA Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.1 - TA Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.1 - TA Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.1 - TA Part 4.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.2 - A29 WCHAR Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.2 - A29 WCHAR Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 8.2 - A29 WCHAR Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.1 - Prelim Ecol App.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.2 - Bats.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.4 - Dormouse.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.5 - Breeding Bird.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.6 - Wintering Bird.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.7 - Reptiles.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.8 - GCN Survey Report.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.9 HRSA - edit_Optimized.pdf (0 kb) Supporting Document 28/10/2020
Appendix 9.10 - BNG Final Assessment.pdf (0 kb) Supporting Document 28/10/2020
Appendix 10.1 - LVA Methodology.pdf (0 kb) Supporting Document 28/10/2020
Appendix 10.2 - Lighting Assessment.pdf (0 kb) Supporting Document 28/10/2020
Appendix 10.3 - Planting schedule.pdf (0 kb) Supporting Document 28/10/2020
Appendix 10.4 - LMMP.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 4.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 5.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 6.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 7.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 8.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 9.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.1 - Flood Risk Assessment Part 10.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.2 - HEWRAT.pdf (0 kb) Supporting Document 28/10/2020
Appendix 11.3 - Watercourse Location Map.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA - Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA -Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA -Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA -Part 4.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA -Part 5.pdf (0 kb) Supporting Document 28/10/2020
Appendix 12.1 - PRA -Part 6.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.1 - ADBA.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.2 - Geophysical survey.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.3 - Arch Mitigation Stategy Part 2.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.3 - Arch Mitigation Stategy Part 3.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.3 - Arch Mitigation Stategy Part 4.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.3 - Arch Mitigation Stategy Part 5.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.3 - Arch Mitigation Strategy Part 1.pdf (0 kb) Supporting Document 28/10/2020
Appendix 13.4 - Arch WSI.pdf (0 kb) Supporting Document 28/10/2020
Appendix 14.1 - Long-list of committed developments.pdf (0 kb) Supporting Document 28/10/2020
Appendix A - Planning Policy.pdf (0 kb) Supporting Document 28/10/2020
Appendix B - Minerals Safeguarding Statement .pdf (0 kb) Supporting Document 28/10/2020
Appendix C - Aerodrome Safeguarding Statement.pdf (0 kb) Supporting Document 28/10/2020
Appendix D - A29 Realignment Consultation Report.pdf (0 kb) Supporting Document 28/10/2020
Appendix E - Road Safety Audit and Designers Response.pdf (0 kb) Supporting Document 28/10/2020
Planning Statement.pdf (0 kb) Planning Statement 28/10/2020
Site Location Plan.pdf (0 kb) Site Plan 28/10/2020
Drainage Strategy Layout.pdf (0 kb) Supporting Document 29/10/2020
Cross Sections Sheet 1 of 3.pdf (0 kb) Application Plans 06/05/2021
Cross Sections Sheet 2 of 3.pdf (0 kb) Application Plans 06/05/2021
Cross Sections Sheet 3 of 3.pdf (0 kb) Application Plans 06/05/2021
Fontwell Avenue Roundabout Cross Section Sheet 1 of 2.pdf (0 kb) Application Plans 06/05/2021
Fontwell Avenue Roundabout Cross Section Sheet 2 of 2.pdf (0 kb) Application Plans 06/05/2021
Chapter 7 - Noise and Vibration.pdf (0 kb) Revised Environmental Statement 06/05/2021
Chapter 10 - LVIA.pdf (0 kb) Revised Environmental Statement 06/05/2021
A29-JCE-GEN-00-PW-Z-021_S4_P03 - CTMP 12.11.21.pdf (0 kb) Condition 4 (CTMP) - Scheme Pending 21/12/2021
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (1).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (2).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (3).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (4).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (5).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (6).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (7).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (8).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
A29-JCE-GEN-00-PW-Z-009_S4_P07_exc badger_V2_compressed (9).pdf (0 kb) Condition 3 (CEMP) - Scheme Pending 07/01/2022
70079718-WSP-A29-XX-RP-LI-0001-P02.pdf (0 kb) Condition 13 (Lighting) - Scheme Pending 03/03/2022